Cummings, McGowan and West Incorporated
 

 

MARION POWER PLANT POUR
 

 

 

 

 

The pour began at 11:25 a.m. and ended at 10:46 p.m.  

 

 

 



Trucks included:

  • (4) 10 yard boost-a-loads
  • (18) 8 yard

 

No Breakdowns!!

 

 

 

 

     Batch Time: 2.5 min/load

     Material Loading @ 220 lbs/sec.


 

 



Every load was tested for:
  • Temperature
  • Slump
  • Air

 

 

 

                                       KEEPING THINGS COOL

 

 

 


© 2001 CUMMINGS, McGOWAN & WEST INCORPORATED